The Arkansas Oil and Gas Commission last week issued 31 drilling permits, 17 well completions and 13 well recompletions. By county, they were: DRILLING PERMITS

CLEBURNE - SEECO Inc. of Houston for Hipp No. 09-09 1-7H6 to TVD: 5,000 ft. and MD: 13,000 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 350 ft. FSL & 2,079 ft. FWL of Sec. 7-9N-9W and PBHL: 2,383 ft. FSL & 1,310 ft. FWL of Sec. 6-9N-9W. Contractor: Pense 29; work begins April 30.

SEECO Inc. for Hipp No. 09-09 2-7H6 to TVD: 5,000 ft. and MD: 13,500 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 350 ft. FSL & 2,059 ft. FWL of Sec. 7-9N-9W and PBHL: 2,362 ft. FSL & 660 ft. FWL of Sec. 6-9N-9W. Contractor: Pense 29; work begins April 30.

SEECO Inc. for Hipp No. 09-09 3-7H6 to TVD: 5,000 ft. and MD: 12,500 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 350 ft. FSL & 2,099 ft. FWL of Sec. 7-9N-9W and PBHL: 2,400 ft. FSL & 1,959 ft. FWL of Sec. 6-9N-9W. Contractor: Pense 29; work begins May 6.

SEECO Inc. for O Dwyer No. 10-09 1-21H28 to TVD: 380 ft. and MD: 11,900 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 2,311 ft. FSL & 1,358 ft. FWL of Sec. 21-10N-9W and PBHL: 490 ft. FSL & 2,638 ft. FWL of Sec. 28-10N-9W. Contractor: Pense 03; work begins Sept. 25.

SEECO Inc. for O Dwyer No. 10-09 2-21H28 to TVD: 3,800 ft. and MD: 11,300 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 2,271 ft. FSL & 1,360 ft. FWL of Sec. 21-10N-9W and PBHL: 490 ft. FSL & 2,038 ft. FWL of Sec. 28-10N-9W. Contractor: Pense 03; work begins Oct. 2.

SEECO Inc. for O Dwyer No. 10-09 3-21H28 to TVD: 3,800 ft. and MD: 11,000 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 2,251 ft. FSL & 1,361 ft. FWL of Sec. 21-10N-9W and PBHL: 490 ft. FSL & 1,438 ft. FWL of Sec. 28-10N-9W. Contractor: Pense 03; work begins Sept. 29.

SEECO Inc. for O Dwyer No. 10-09 4-21H28 to TVD: 3,800 ft. and MD: 11,400 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 2,291 ft. FSL & 1,359 ft. FWL of Sec. 21-10N-9W and PBHL: 490 ft. FSL & 838 ft. FWL of Sec. 28-10N-9W. Contractor: Pense 03; work begins Oct. 6.

XTO Energy Inc. of Oklahoma City for McCarty No. 3-28H21 to TVD: 2,780 ft. and MD: 7,850 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 232 ft. FNL & 800 ft. FEL of Sec. 28-11N-11W and PBHL: 560 ft. FNL & 1,119 ft. FEL of Sec. 21-11N-11W. Contractor: Union Drilling; work began Jan. 22.

COLUMBIA - Bonanza Creek Energy Resources LLC of Houston for Franks No. 7-21 to TVD: 8,800 ft. and MD: 8,800 ft. in Cotton Valley Form. of Dorcheat Macedonia Fld. Loc. SHL: 280 ft. FEL & 1,038 ft. FNL and PBHL: 280 ft. FEL & 1,038 ft. FNL of Sec. 21-18S-21W. Contractor: Reliance Well Service; work begins Feb. 26.

Bonanza Creek Energy Resources LLC for Franks-Norwood No. 6 to TVD: 8,800 ft. and MD: 8,800 ft. in CottonValley Form. of Dorcheat Macedonia Fld. Loc. SHL: 280 ft. FEL & 1,592 ft. FSL and PBHL: 280 ft. FEL & 1,592 ft. FSL of Sec. 16-18S-21W. Contractor: Relaince Well Service; work begins March 1.

CONWAY - SEECO Inc. for Patsy Haynes No. 08-16 10-28H21 to TVD: 6,000 ft. and MD: 12,300 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 680 ft. FNL & 1,621 ft. FEL of Sec. 28-8N-16W and PBHL: 490 ft. FNL & 1,654 ft. FEL of Sec. 21-8N-16W. Contractor: Pense 16; work begins Aug. 14.

SEECO Inc. for Patsy Haynes No. 08-16 11-28H21 to TVD: 6,000 ft. and MD: 12,300 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 681 ft. FNL & 1,641 ft. FEL of Sec. 28-8N-16W and PBHL: 490 ft. FNL & 2,254 ft. FEL of Sec. 21-8N-16W. Contractor: Pense 16; work begins Aug. 21.

SEECO Inc. for Patsy Haynes No. 08-16 12-28H21 to TVD: 6,000 ft. and MD: 13,000 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 678 ft. FNL & 1,581 ft. FEL of Sec. 28-8N-16W and PBHL: 230 ft. FNL & 454 ft. FEL of Sec. 21-8N-16W. Contractor: Pense 16; work begins Aug. 21.

SEECO Inc. for Patsy Haynes No. 08-16 8-28H21 to TVD: 6,000 ft. and MD: 12,400 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 372 ft. FNL & 1,077 ft. FWL of Sec. 28-8N-16W and PBHL: 490 ft. FNL & 2,409 ft. FWL of Sec. 21-8N-16W. Contractor: Pense 16; work begins March 10.

SEECO Inc. for Patsy Haynes No. 08-16 9-28H21 to TVD: 6,000 ft. and MD: 12,400 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 679 ft. FNL & 1,601 ft. FEL of Sec. 28-8N-16W and PBHL: 490 ft. FNL & 1,054 ft. FEL of Sec. 21-8N-16W. Contractor: Pense 16; work begins Aug. 7.

LAFAYETTE - F W Rabalais Inc. of Fort Worth for Endsley No. 1 to TVD: 3,600 ft. and MD: 3,600 ft. in Tokio Form. of Wildcat Fld. Loc. SHL: 1,045 ft. FEL & 1,040 ft. FSL and PBHL: 1,040 ft. FSL & 1,045 ft. FEL of Sec. 32-18S-25W. Contractor: Mike Rogers Drilling; work began Jan. 18.

NEVADA - Weiser-Brown Operating Co. of Magnolia for Foote No. 1 to TVD: 5,500 ft. and MD: 5,500 ft. in Smackover Form. of Willisville Southwest Fld. Loc. SHL: 1,767 ft. FWL & 1,625 ft. FNL of Sec. 30-14S-21W. Contractor: Mike Rogers Drilling Co.; work began Jan. 23.

OUACHITA - Will-Drill Operating LLC of Shreveport for Plum Creek No. 1-18 to TVD: 4,100 ft. and MD: 4,100 ft. in Rodessa Form. of Wildcat Fld. Loc. SHL: 534 ft. FSL & 2,289 ft. FEL and PBHL: 534 ft. FSL & 2,289 ft. FEL of Sec. 18-15S-16W. Contractor: Rogers Drilling; work began Jan. 25.

SEBASTIAN - Stephens Production Co. of Fort Smith for Ware No. 14-32 to TVD: 6,700 ft. and MD: 6,700 ft. in Middle Atoka Form. of B-44 Fld. Loc. SHL: 2,100 ft. FNL & 560 ft. FWL and PBHL: 2,100 ft. FNL & 560 ft. FWL of Sec. 32-6N-30W. Contractor: Redland Energy Services LLC; work began Jan. 22.

UNION - Berg, Laney and Brown Co. of Camden for Cook No. 17 to TVD: 2,800 ft. and MD: 2,800 ft. in Nacatoch Form. of Smackover Fld. Loc. SHL: 996ft. FNL & 1,290 ft. FEL and PBHL: 996 ft. FNL & 1,290 ft. FEL of Sec. 16-16S-15W. Contractor: not available; work began Jan. 22.

Quanico Oil & Gas Inc. of El Dorado for Schmidt B-3 to TVD: 6,000 ft. and MD: 6,000 ft. in Cotton Valley Form. of Champagnolle Fld. Loc. SHL: 1,657 ft. FNL & 955 ft. FEL and PBHL: 1,657 ft. FNL & 955 ft. FEL of Sec. 16-17S-14W. Contractor: Sewell Drilling Co. LLC; work begins Feb. 20.

VAN BUREN - SEECO Inc. for Deltic Timber Corp No. 10-12 2-3H10 to TVD: 3,200 ft. and MD: 9,000 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 299 ft. FSL & 1,636 ft. FWL of Sec. 3-10N-12W and PBHL: 1,400 ft. FSL & 210 ft. FWL of Sec. 10-10N-12W. Contractor: DDI 30; work begins March 28.

SEECO Inc. for Deltic Timber Corp No. 10-12 3-3H10 to TVD: 3,200 ft. and MD: 8,200 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 299 ft. FSL & 1,676 ft. FWL of Sec. 3-10N-12W and PBHL: 1,520 ft. FSL & 962 ft. FWL of Sec. 10-10N-12W. Contractor: DDI 30; work begins April 3.

SEECO Inc. for Linn No. 10-12 6-8H to TVD: 3,500 ft. and MD: 9,000 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 581 ft. FNL & 828 ft. FEL and PBHL: 105 ft. FSL & 776 ft. FEL of Sec. 8-10N-12W. Contractor: Pense 29; work begins April 30.

SEECO Inc. for Linn No. 10-12 7-8H17 to TVD: 3,500 ft. and MD: 9,000 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 561 ft. FNL & 827 ft. FEL of Sec. 8-10N-12W and PBHL: 419 ft. FNL & 174 ft. FEL of Sec. 17-10N-12W. Contractor: Pense 29; work begins April 30.

SEECO Inc. for Linn No. 10-12 8-8H16 to TVD: 3,300 ft. and MD: 10,500 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 541 ft. FNL & 826 ft. FEL of Sec. 8-10N-12W and PBHL: 856 ft. FNL &428 ft. FWL of Sec. 16-10N-12W. Contractor: Pense 29; work begins April 30.

SEECO Inc. for Linn No. 10-12 9-8H to TVD: 3,300 ft. and MD: 8,500 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 521 ft. FNL & 825 ft. FEL and PBHL: 771 ft. FNL & 20 ft. FWL of Sec. 8-10N-12W. Contractor: Pense 29; work begins April 24.

SEECO Inc. for Patton Sisters No. 11-14 7-34H to TVD: 2,500 ft. and MD: 8,000 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 404 ft. FSL & 1,626 ft. FWL and PBHL: 295 ft. FNL & 1,168 ft. FWL of Sec. 34-11N-14W. Contractor: Pense 18; work begins June 3.

SEECO Inc. for Patton Sisters No. 11-14 8-34H to TVD: 2,500 ft. and MD: 8,000 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 384 ft. FSL & 1,626 ft. FWL and PBHL: 217 ft. FNL & 1,968 ft. FWL of Sec. 34-11N-14W. Contractor: Pense 18; work begins June 6.

SEECO Inc. for Patton Sisters No. 11-14 9-34H3 to TVD: 2,500 ft. and MD: 8,000 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 364 ft. FSL & 1,626 ft. FWL of Sec. 34-11N-14W and PBHL: 895 ft. FSL & 1,266 ft. FWL of Sec. 3-10N-14W. Contractor: Pense 18; work begins June 9.

WHITE - SEECO Inc. for Barber No. 09-06 3-1H to TVD: 3,236 ft. andMD: 7,665 ft. in Fayetteville Form. of B-43 Fld. Loc. SHL: 400 ft. FSL & 2,081 ft. FEL and PBHL: 340 ft. FNL & 2,035 ft. FEL of Sec. 1-9N-6W. Contractor: DDI 31; work began Nov. 22, 2012.

WELL COMPLETIONS

CLEBURNE - SEECO Inc. for Green Bay Packaging No. 10-8 10-13H12, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 7,793 ft., perf. 3,202-7,709 OA ft. Loc. SHL: 180 ft. FNL & 1,093 ft. FEL and BHL: 488 ft. FNL & 1,596 ft. FEL of Sec. 13-10N-8W. Completed Dec. 12, 2012.

SEECO Inc. for Green Bay Packaging No. 10-8 11-13H12, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 8,151 ft., perf. 3,978-8,067 OA ft. Loc. SHL: 179 ft. FNL & 1,113 ft. FEL and BHL: 490 ft. FNL & 2,184 ft. FEL of Sec. 13-10N-8W. Completed Jan. 5.

COLUMBIA - Betsy Production Co. Inc. of Magnolia for Southside Park No. 1, 24-hr. prod. not available in Tokio Form. of Columbia Fld. Drilled to TD: 4,640 ft., dry hole. Loc. 553 ft. FSL & 2,226 ft. FEL of Sec. 13-17S-21W. Completed Jan. 16.

CONWAY - SEECO Inc. for Kenneth McCoy No. 8-15 6-7H6, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 10,413 ft., perf. 4,600-10,318 OA ft. Loc. SHL: 300 ft. FNL & 2,018 ft. FEL and BHL: 74 ft. FNL & 1,490 ft. FWL of Sec. 7-8N-15W. Completed Dec. 22, 2012.

SEECO Inc. for Kenneth McCoy No. 8-15 7-7H6, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 9,530 ft., perf. 4,716-9,435 OA ft. Loc. SHL: 300 ft. FNL & 1,998 ft. FEL and BHL: 67 ft. FNL & 2,093 ft. FWL of Sec. 7-8N-15W. Completed Dec. 23, 2012.

OUACHITA - Arklatx Operating Co. Inc. of Smackover for Oscar No. 23, 24-hr. prod. not available in Blossom Form. of Smackover Fld. Drilled to TD: 2,800 ft., perf. 2,566-2,568 ft. Loc. 280 ft. FNL & 1,990 ft. FEL of Sec. 33-15S-15W. Completed Oct. 23, 2012.

Corley Trust LLC of Smackover for D N Johnson No. 10, 24-hr. prod. 2 bbls in Tokio Form. of Smackover Fld. Drilled to TD: 2,913 ft., perf. 2,653-2,654 ft. Loc. 663 ft. FSL & 2,372 ft. FEL of Sec. 34-15S-15W. Completed Dec. 10, 2012.

SEBASTIAN - Stephens Production Co. for Jenkins No. 3-27, 24-hr. prod. 2580 MCF in Middle Atoka Form. of B-44 Fld. Drilled to TD: 5,162 ft. and PBTD: 4,832 ft., perf. 4,296-4,574 OA ft. Loc. SHL: 2,450 ft. FSL & 770 ft. FEL and BHL: 2,450 ft. FSL & 770 ft. FEL of Sec. 27-6N-31W. Completed Jan. 16.

Stephens Production Co. for Mc-Gee No. 14-35X26, 24-hr. prod. not available in Middle Atoka Form. of B-44 Fld. Drilled to TD: 6,300 ft. and PBTD: 6,193 ft., perf. 2,274-6,164 OA ft. Loc. SHL: 250 ft. FNL & 1,125 ft. FEL and BHL: 250 ft. FNL & 1,125 ft. FEL of Sec. 35-6N-30W. Completed Jan. 10.

UNION - Arklatx Operating Co. Inc. for Fee B No. 4, 24-hr. prod. not available in Tusscaloosa Form. of Shuler Fld. Drilled to TD: 7,670 ft., perf. 3,131.5-3,133.5 ft. Loc. 1,822 ft. FNL & 1,761 ft. FEL of Sec. 20-18S-17W.Completed date not available.

Arklatx Operating Co. Inc. for Riley B No. 8, 24-hr. prod. not available in Blossom Form. of Smackover Fld. Drilled to TD: 2,580 ft., perf. 2,627-2,629 ft. Loc. 2,380 ft. FSL & 500 ft. FWL of Sec. 9-16S-15W. Completed Oct. 17, 2012.

Edna Oil Co. LLC of El Dorado for Lawton No. 6, 24-hr. prod. 1 bbls in Tokio Form. of Smackover Fld. Drilled to TD: 2,801 ft., perf. 2,715.5-2,716.5 ft. Loc. 2,417 ft. FSL & 2,049 ft. FWl of Sec. 10-16S-15W. Completed Nov. 5, 2011.

VAN BUREN - XTO Energy Inc. for Deltic No. 3-18H7, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 10,727 ft. and PBTD: 10,622 ft., perf. 4,320-10,602 OA ft. Loc. SHL: 1,530 ft. FNL & 219 ft. FWL and BHL: 8 ft. FNL & 263 ft. FWL of Sec. 18-9N-12W. Completed Dec. 28, 2012.

WHITE - SEECO Inc. for Reed No. 10-07 5-19H, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 7,833 ft., perf. 3,553-7,742 OA ft. Loc. SHL: 410 ft. FSL & 979 ft. FEL and BHL: 15 ft. FNL & 764 ft. FEL of Sec. 19-10N-7W. Completed Dec. 13, 2012.

SEECO Inc. for Riley No. 9-6 6-22H10, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 8,906 ft., perf. 3,805 ft. - 8,822 OA ft. Loc. SHL: 323 ft. FNL & 963 ft. FEL and BHL: 55 ft. FSL & 964 ft. FEL of Sec. 22-9N-6W. Completed Dec. 17, 2012.

SEECO Inc. for Riley No. 9-6 7-22H10, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 9,025 ft., perf. 3,984 ft. - 8,942 OA ft. Loc. SHL: 303 ft. FNL & 962 ft. FEL and BHL: 65 ft. FSL & 327 ft. FEL of Sec. 22-9N-6W. Completed Dec. 17, 2012.

SEECO Inc. for Riley No. 9-6 8-22H21, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 7981 ft., perf. 4,044-7,896 OA ft. Loc. SHL: 728 ft. FSL & 206 ft. FWL and BHL: 2 ft. FNL & 348 ft. FEL of Sec. 22-9N-6W. Completed Dec. 22, 2012.

WELL RECOMPLETIONS

CLEBURNE - SEECO Inc. for Turney Brothers No. 10-12 6-1, 24-hr. prod. not available in Fayetteville Form. of B-43 Fld. Drilled to TD: 2,923 ft., perf. 2,395-2,673 OA ft. Loc. 1,182 ft. FSL & 82 ft. FWL of Sec. 1-10N-12W. Workover done Dec. 21, 2012.

COLUMBIA - Bonanza Creek Energy Resources LLC for Dorcheat Macedonia No. 55, 24-hr. prod. 13 bbls in Cotton Valley Form. of Dorcheat Macedonia Fld. Drilled to TD: 8,888 ft., perf. 6,735-8,712 OA ft. of Sec. 11-18S-22W. recompletion done Jan. 7.

Bonanza Creek Energy Resources LLC for Franks-Norwood No. 5, 24-hr. prod. 34 bbls in Cotton Valley Form. of Dorcheat Macedonia Fld. Drilled to TD: 8,815 ft., perf. 6,745-8,501 OA ft. of Sec. 16-18S-21W. Recompletion done Jan. 11.

Bonanza Creek Energy Resources LLC for Kirkpatrick No. 5, 24-hr. prod. 0 bbls in Cotton Valley Form. of Dorcheat Macedonia Fld. Drilled to TD: 8,800 ft .,perf. 6,744-8,530 OA ft. of Sec. 13-18S-22W. Recompletion done Dec. 13.

FRANKLIN - XTO Energy Inc. for Franklin No. 2T, 24-hr. prod. not available in Middle Hale Form. of Cecil Fld. Drilled to TD: 5,093 ft., perf. 4,844-4,891 ft. Loc. 1,320 ft. FSL & 1,000 ft. FWL of Sec. 26-9N-28W. Reinstatement done Jan. 17.

XTO Energy Inc. for Franklin No. 4-26T, 24-hr. prod. not available in Ralph Barton Form. of Cecil Fld. Drilled to TD: 5,100 ft., perf. 3,944-3,980 ft. Loc. 1,320 ft. FNL & 900 ft. FEL of Sec. 26-9N-28W. Reinstatement done Jan. 17.

LOGAN - Foundation Energy Mgmt. of Dallas for Hembree No. 1-8, 24-hr. prod. not available in Dunn C/ Lower Hake Form. of Aetna Fld. Drilled to TD: 7,281 ft., perf. 5,914-7,142 OA ft. Loc. 1,320 ft. FNUL & 1,320 ft. FEUL of Sec. 8-8N-26W. Workover done Dec. 18, 2012.

OUACHITA - Arklatx Operating Co. Inc. for Sid Unstead No. 11, 24-hr. prod. 3 bbls in Blossom Form. of Smackover Fld. Drilled to TD: 2,800 ft., perf. 2,568-2,572 OA ft. Loc. 280 ft. FNL & 500 ft. FWL of Sec. 32-15S-15W. Workover done Dec. 20, 2012.

UNION - 3G Energy LLC of El Dorado for Frost F No. 6, 24-hr. prod. 6 bbls in Travis Peak Form. of El Dorado East Fld. Drilled to TD: 6,001 ft., perf. 3,610-3,624 OA ft. Loc. 1,038 ft. FNL & 2,390 ft. FEL of Sec. 13-17S-15W. Recompletion done Jan. 4.

Arklatx Operating Co. Inc. for J H Calloway No. 11, 24-hr. prod. not available in Meakin-Graves Form. of Smackover Fld. Drilled to TD: 2,560 ft., perf. 2,400-2,460 OA ft. Loc. 1,970 ft. FSL & 523 ft. FEL of Sec. 4-16S-15W. Recompletion done Jan. 4.

Arklatx Operating Co. Inc. for Murphy Hardy E No. 59, 24-hr. prod. 1 bbls in Nacatoch Form. of Smackover Fld. Drilled to TD: 2,804 ft., perf. 1,956-2,000 OA ft. Loc. 1,550 ft. FSL & 660 ft. FEL of Sec. 5-16S-15W. Workover done Dec. 19, 2012.

Arklatx Operating Co. Inc. for Palm No. 11, 24-hr. prod. 1 bbls in Nacatoch Form. of Smackover Fld. Drilled to TD: 2,367 ft., perf. 1,939-1,944 OA ft. Loc. 4,593 ft. FSL & 200 ft. FWL of Sec. 3-16S-15W. Workover done Jan. 10.

Smackover Drilling Co. Inc. of Shreveport for Gregory No. 1, 24-hr. prod. not available in not available Form. of Champagnolle Fld. Drilled to TD: 4,380 ft., perf. 3,060-3,281 OA ft. Loc. 280 ft. FSL & 280 ft. FEL of Sec. 10-17S-14W. Unsuccessful recompletion done Jan. 15.

ABBREVIATIONS

Loc. - location; Perf. - perforations; FEL - from the east line; FNL - from the north line; FSL - from the south line; FWL - from the west line; FEUL - from the east unit line; FWUL - from the west unit line; FNUL - from the north unit line; FSUL - from the south unit line; MCF - thousand cubic feet; bbl - barrel; MD - measured depth; TD - total depth; TVD - true vertical depth; PBTD - plug back total depth; BHL - bottom hole location; PBHL - proposed bottom hole location; SHL - surface hole location; OA - overall; N/A - not available.